AbouRizk, S and Shi, J (1994) Automated Construction‐Simulation Optimization. Journal of Construction Engineering and Management, 120(02), 374–85.

AbouRizk, S M, Halpin, D W and Wilson, J R (1994) Fitting Beta Distributions Based on Sample Data. Journal of Construction Engineering and Management, 120(02), 288–305.

Bai, Y and Amirkhanian, S N (1994) Knowledge‐Based Expert System for Concrete Mix Design. Journal of Construction Engineering and Management, 120(02), 357–73.

Everett, J G and Slocum, A H (1994) Automation and Robotics Opportunities: Construction versus Manufacturing. Journal of Construction Engineering and Management, 120(02), 443–52.

Farid, F and Koning, T L (1994) Simulation Verifies Queuing Program for Selecting Loader‐Truck Fleets. Journal of Construction Engineering and Management, 120(02), 386–404.

  • Type: Journal Article
  • Keywords: Construction; Productivity; Earthmoving; Equipment; Selection; Queueing; Simulation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(386)
  • Abstract:
    Proper equipment selection can yield substantial savings in time and cost. MicroCYCLONE simulation package is used to verify the FLEET queuing program. FLEET models multiloader‐truck systems using exponential distribution at steady state. A few FLEET assumptions are redefined to closely model real‐world construction processes. Graphical solutions illustrate effects of the cycle‐time modeling and transient state on multiloader‐truck fleet selection. FLEET is shown to be an accurate model of the steady‐state, multiloader‐truck process if exponential distribution did accurately fit load‐ and travel‐time distributions. But, erlang or beta distribution more closely fits actual load and travel times in construction. Modeling load and travel times of loader‐truck fleets with exponential, instead of beta, distribution results in underestimation of production and overestimation of unit cost by 4–7%. Simulation results of a more accurate model that uses beta distribution and considers transient state, in addition to steady state, indicate that multiloader‐truck fleets may experience a 4–5% production increase and unit‐cost decrease compared to FLEET results.

Furuya, N, Yamaoka, R and Paulson, B C (1994) Construction of Akashi‐Kaikyo Bridge West Anchorage. Journal of Construction Engineering and Management, 120(02), 337–56.

Hinze, J and Tracey, A (1994) The Contractor‐Subcontractor Relationship: The Subcontractor's View. Journal of Construction Engineering and Management, 120(02), 274–87.

Ndekugri, I and Turner, A (1994) Building Procurement by Design and Build Approach. Journal of Construction Engineering and Management, 120(02), 243–56.

Nishigaki, S, Vavrin, J, Kano, N, Haga, T, Kunz, J C and Law, K (1994) Humanware, Human Error, and Hiyari‐Hat: A Template of Unsafe Symptoms. Journal of Construction Engineering and Management, 120(02), 421–42.

Pin, T H and Scott, W F (1994) Bidding Model for Refurbishment Work. Journal of Construction Engineering and Management, 120(02), 257–73.

Severson, G D, Russell, J S and Jaselskis, E J (1994) Predicting Contract Surety Bond Claims Using Contractor Financial Data. Journal of Construction Engineering and Management, 120(02), 405–20.

Thomas, H R, Smith, G R and Mellott, R E (1994) Interpretation of Construction Contracts. Journal of Construction Engineering and Management, 120(02), 321–36.

Williams, T P (1994) Predicting Changes in Construction Cost Indexes Using Neural Networks. Journal of Construction Engineering and Management, 120(02), 306–20.